Things are still moving along at a fast clip. The concrete for the end of the ramp and the new sidewalk adjacent to it, at the proper slope, should be poured today. The new partial wall at the east end of the genealogy room is going up. Lights are being installed in the genealogy area, the rotation room has been painted, and some ceiling work has been done.
Here the sidewalk is being removed from where the ramp joins the sidewalk. The new sidewalk will have a smooth interface with the ramp, and will have a slight slope to the old sidewalk to meet ADA guidelines.
Here is where the sidewalk is ready to be poured.
The SEKLS rotating books room has new lights and paint.
Iron posts were bolted to the floor to support a new partial wall at the east end of the genealogy room.
And here are the studs for the partial wall.