The signage for the areas renovated since the first phase was installed this week. We’ve begun putting up shelving in preparation for moving back into the phase 3 area next week.
This photo shows signage in the children’s department, as well as some of the shelves which have been installed. Other shelving has to wait until we move some of the books, since it’s currently being used in the west room.
The genealogy room with installation of signs done and shelving in progress.
Doors at the back of the meeting room. Obviously, the children’s department is beyond the door to the right, and SEKLS offices will be beyond the door to the left. The double image in the sign on the window to the left must be an effect of the flash, because it doesn’t really look that way.